For procurement teams

Putting a DMS out to tender

What belongs in the specification, which eligibility criteria hold up, and which clause goes missing most often. Written for the people preparing a tender, not as an advertisement for us.

Four points where DMS tenders come apart

Not on price, but on requirements that were raised too late.

Data protection and where the system runs

Ask for: Server location in the EU only, named sub-processors, a processing agreement under Article 28 GDPR, and a deletion policy with defined periods.

A vendor with a US parent company can fall under the US CLOUD Act even with an EU data centre. Ask where the group is domiciled, not only where the servers are.

Audit-proof storage

Ask for: Unalterable filing, a complete log of every access, retention periods per document type, and an export format an auditor can work with.

The technical functions alone are not enough. Ask for the vendor’s statement on the Verfahrensdokumentation, the written process documentation German tax auditors expect, in the same breath.

Dividing the contract into lots

Ask for: Tender licences, hosting, migration and training as separate lots.

A single five-year all-in contract ties you to one vendor. Separate lots keep the competition alive and lower the risk when you want to move.

Exit and data export

Ask for: A full export in open formats, with the deadline and the cost settled in the contract, and the metadata and folder structure handed over with it.

Without that clause a change of system becomes an obstacle to the next tender, and the next tender becomes a formality.

A checklist to take with you

Our guide to DMS tenders sets the criteria out as a scoring grid, including a sovereignty matrix and suggested wording for the specification.

Read the OZG 2.0 checklist for DMS tenders

Common questions about tendering a DMS