All guidesPractical guide

SharePoint migration: the practical guide for 2026

What you need to know before, during and after a SharePoint migration. Drawn from twelve real migration projects in 2025.

15 min read
Written for: IT managers and company owners who want to leave SharePoint, or have to, whether for reasons of sovereignty, cost or sheer complexity

During 2025 we moved twelve mid-sized companies from SharePoint to a dedicated DMS. They ranged from a twenty-five-person tax practice with 800 GB of data to a six-hundred-person engineering firm with 14 TB and 47 PowerApps. This guide collects what we learned: what works, what goes wrong, and how long it realistically takes.

It is written as a set of checklists for the individual project phases. Our English blog covers the same ground from a different angle in migrating out of an outgrown document system.

Phase 1: when is a migration really necessary?

Not every SharePoint grievance justifies a migration. The clear triggers are these:

  • Problems with sovereignty or the GDPR, for instance an obligation under NIS 2, the German professional-secrecy rule in section 203 of the criminal code, or the requirements of a public tender
  • Performance problems in large libraries, above roughly 50,000 documents
  • Costs escalating through changes to Microsoft 365 tariffs
  • Complexity grown so far that nobody in the organisation still has an overview
  • Worries about vendor lock-in looking five to ten years ahead

The weak triggers:

  • "We do not much like the interface." That is a training problem, not a system problem.
  • "We want to get away from Microsoft." Understandable as a feeling, but on its own it produces no return.

When the migration does come, set it up as a strategic project rather than an IT operation.

Phase 2: taking stock (weeks 1-3)

The most expensive migration mistakes come from an incomplete survey. Before you take any technical decision, you need the following.

Site collection discovery

List every site, subsite, library and list. Use ShareGate, AvePoint, the Microsoft 365 admin centre or your own PowerShell scripts. A medium-sized setup has thirty to a hundred sites; a large one two hundred to five hundred.

A permission audit

Who has access to what? In SharePoint permissions are often set at item level, and that rarely maps one to one onto the target system. Consolidate them into role-based rights: case worker, manager, management.

A survey of the workflows

Inventory every Power Automate, Microsoft Flow and SharePoint workflow. We have had customers with more than eighty active workflows, forty of which nobody could explain any more. That is where migrations blow up.

A PowerApps inventory, the most underestimated trap of all

If you have custom apps built on SharePoint, put together by former staff, consultants or internal power users, the complexity of the migration rises steeply. One engineering project of ours had to be called off in 2025 because more than thirty production-critical PowerApps had no one left who understood them. We no longer start a migration project without inventorying the PowerApps first.

Integrations with other systems

Which external tools read from or write to SharePoint? Power BI, Dynamics 365, custom applications, connections to DATEV or SAP? Every one of them has to appear in the migration plan.

Phase 3: the target architecture (weeks 4-5)

Before the first lift begins you need a clear target architecture. Without one you simply rebuild SharePoint inside the new system.

No more permission trees, but role-based rights. People change roles, not permissions.

Consolidate the workflows. In our projects eighty often chaotic Power Automate flows typically became twelve to twenty clean BPMN workflows. Reducing the workflows is a project phase in its own right.

A clear data structure. Instead of sites and libraries: files, described by metadata rather than by depth of folders. A migration is the chance to get that right at last.

Keep a read-only copy. Plan for the old SharePoint to stay available read-only for six to twelve months after cutover, as an emergency backstop in case something was forgotten.

Phase 4: the pilot (weeks 6-12)

Before the main project starts, run a pilot with:

  • a test migration of 100 to 500 documents to validate the tool
  • a real pilot group of five to ten people from different departments, for four weeks
  • a workflow test covering the three to five most important business processes

The things a tool test typically turns up:

  • the metadata mapping is wrong, for instance date fields in the wrong format
  • email attachments go missing
  • version histories come across incomplete
  • special characters in file names crash the migration
  • OneNote notebooks cannot be carried over one to one

These have to be found in the pilot. In the main project they are expensive.

Phase 5: cutover and parallel running (weeks 13-26)

No successful project has switched over in a single night. Sixty to ninety days of parallel running is the norm:

  • new documents go into the new system from an agreed date, communicated clearly to everyone
  • old documents are migrated in stages, prioritised by how often they are used
  • SharePoint stays read-only for at least six months as a backstop

Bandwidth is often the bottleneck. Above about 4 TB the internet connection is what limits you. On one project we shipped a physical disk to the data centre, a Hetzner storage box, rather than migrate over the internet for six weeks.

Phase 6: stabilisation and clean-up (months 7-12)

After a successful cutover:

  • the read-only SharePoint, with a plan for switching it off for good
  • workflow refinements based on what users report
  • a training refresher for the people not yet using the new system fully
  • documentation of the final file structure and the permission scheme

Realistic figures for 2026

If you are planning a SharePoint migration in 2026, budget along these lines:

Factor50 staff200 staff
Project duration4-6 months8-12 months
Consultancy cost25,000-60,000 €80,000-180,000 €
Internal effortone full-time person for the projectone to two full-time people plus departmental heads
Stabilisation phase3-6 months6-12 months

In closing

A SharePoint migration is doable, but it is not a routine project. Underestimate the effort and you walk into the same mess again, only with different software.

Successful migrations have three things in common: a thorough survey before any technical decision, a clear target architecture rather than a one-to-one rebuild, and an honest pilot phase with real users.

If you are planning a migration, talk to us. We often give a free assessment of how complex yours would be and tell you honestly what is achievable in what time.

Need this as a PDF?

The guide above is complete. Nothing is held back behind a form.