For production and logistics

Don't wait six months. Start tomorrow

Shop-floor digitalisation without an ERP change. You need a new process. Your ERP consultant says Q3 at the earliest, budget forty thousand. We say it can be live the day after tomorrow, from 360 euros a year.

Operator on the shop floor with a tabletAI-generated image
360 €
per user and year, published, no setup fee
0 €
for external portal users, whatever their number
Germany
Hetzner Falkenstein and Nuremberg, database in Frankfurt
99.9 %
availability per month in the standard tariff

We publish no figures for time saved or paper avoided. We have not measured them, and a percentage nobody can trace back to a measurement is worth nothing in a comparison.

Does this sound familiar?

IT projects that never end, budgets that grow, and a result that still does not do what was wanted.

Monday, 8am

A customer wants a new process for special orders. You ring your ERP partner.

"We have to put that in the requirements first. Q3 at the earliest, budget 35 to 50 thousand."

Wednesday, 2pm

The production manager needs digital routing slips for a new assembly line.

"That belongs in the current project. Four to six months, then we prioritise it."

Friday, 4pm

Quality management wants an inspection step represented in the system.

"That needs a change request. Eight thousand, and three months before we start."

Project meeting

You want to adjust a workflow because the process has changed.

"That is customising. We will send you a quote. Twelve consultant days as a minimum."

Annual planning

The budget for digitalisation is approved and you finally want to begin.

"Requirements workshops first, then the concept phase, then development. Live in 18 months."

After go-live

The system is running at last. The staff carry on with spreadsheets and paper.

"Too complicated. Too many clicks. The old way was easier."

Enough of that.

It can be done differently

An adviser who answers the same day, a visit within days rather than weeks, and a first process running in a week.

How it goes with us

One adviser, on site quickly, with a working process in days.

1
Today
A call, and your own adviser gets back to you

You describe what you need. Within a few hours your adviser calls back. No call centre and no queue, and the person on the line knows your industry.

Two to four hours to a reply
2
Day 2 to 3
A visit to your works

Your adviser comes to the shop floor, looks at the process, talks to the people running it. In Germany, Austria and Switzerland that is a visit in person; further afield the same session happens over video, and we say so before you ask.

Two to three hours on site
3
Day 4 to 7
The solution stands and testing starts

Your adviser builds it from what the visit showed. A few days later you test with real orders, and anything that does not fit is changed straight away.

Three to five days to go-live

The moment it lands

When your managing director asks on the Friday:
"He was actually here already? And it runs in five days?"
Yes. That is what one adviser instead of a project office gets you.

Your adviser replies within two to four hours

A visit in two to three days across the German-speaking region

Live in five to seven days instead of six months

What customers use it for

Four cases from the works floor, without the names.

Metal fabrication, 45 staff
Set up in a day

The problem

Every order needs its own routing slip with eight to twelve process steps.

Before

The office types a slip in Word, prints it, and loses track of where things are.

After

A team leader creates a new slip in five minutes, and a live board shows every order.

Logistics provider, 120 staff
Set up in two days

The problem

Picking runs on spreadsheet printouts attached to clipboards.

Before

The lists are typed into the system at the end of the shift, slowly and with mistakes.

After

Tablets in the warehouse, a barcode scan, and the booking reaches the ERP by itself.

Electronics manufacturing, 200 staff
Set up in three days

The problem

Quality inspections are recorded on paper and take weeks to evaluate.

Before

Inspectors fill in forms, QM retypes them and builds a spreadsheet report.

After

Digital checklists on the tablet, and the evaluation is there as the shift runs.

Furniture production, 80 staff
Set up in a day

The problem

A kanban system on physical cards, where reordering happens too late.

Before

Cards get overlooked, material runs out, and the line stops.

After

Digital kanban cards that raise an order signal when the minimum stock is reached.

Everything for a digital shop floor

One product for a production environment, not a module you buy twice.

Days, not months

A new process is set up in days instead of waiting out a release cycle for an ERP change.

Your routing slips, digitised

The paper slips and kanban cards you already use, with the process left as it is.

With RFID or without

Scan an RFID tag for speed, or type it in on the tablet. Both work.

Your own people change it

No consultant required. A team leader can build and alter a workflow without us.

Visible while it happens

Where each order stands, without opening the ERP to find out.

Alongside the ERP, not instead of it

It runs next to your ERP, so nothing existing is put at risk.

For the operator

Checking in with an RFID tag

An operator holds their own tag against the tablet, picks the process step and starts work. The documentation happens behind that, without anyone filling in a form.

1

Hold the RFID tag against the tablet

2

Choose the process step

3

Start work, and the time runs by itself

4

Check out when the step is finished

Operator at an industrial machineAI-generated image
Manager with a dashboard in productionAI-generated image
For the manager

A board that is current, not a report that is late

You see the processes as they run, where the queue is forming, and what the step before it took. The decision is then about the numbers rather than about whose estimate to trust.

Time per process step
Who is working on what
Lead times
Where the queue forms
Nobody else does this part

Wait. You do the document management as well?

Yes, and that is the whole point. Shop floor and document management from one supplier. No second vendor, no second training course, one system.

How it usually works

Vendor A: an MES for the shop floor. It records times and steps. Documents? For those you need a DMS.

Vendor B: a DMS for documents. It handles PDFs and invoices. The shop floor? For that you need an MES.

You end up with two systems, two contracts and two training courses, and the documents still go back into a spreadsheet.

How it works here

Aktenplatz: shop floor and document management in one platform, one supplier, one login.

An operator signs off a process step, the system produces the document that belongs to it, an inspection record or a time sheet, and files it in the document management under that order.

Quality management opens the order and sees everything from production, administration and purchasing in one place, archived, searchable, with the audit trail intact.

One flow of data, one version of the truth, nothing retyped in between.

What reaches the archive by itself

Inspection records

A quality check filled in on the tablet becomes a PDF in the folder for that order.

Work instructions

The process step shows the instruction, the operator confirms it, and the confirmation is kept.

Time records

Processing times from the shop floor arrive as a report for costing and controlling.

Photographs and video

A photograph of a problem or a finished piece lands on the right order rather than on a phone.

Material slips

Material taken from stock is scanned on the tablet and recorded against the order.

Signatures

A customer signs off on the tablet and the signed PDF is archived with the audit trail.

Why does nobody else do it?

Because an MES vendor thinks about production and a DMS vendor thinks about the office. On a real shop floor every process step produces a document: an inspection record, a time sheet, a quality report. In two separate systems those end up in a spreadsheet, a word processor or a printout.

One flow: from the machine into the archive

One search: every document for an order in one place

One version: no duplicate spreadsheets, no stale PDFs

Developed with REFA

Built along the German standard for process analysis

The shop-floor part was developed together with REFA, the German institute for work organisation and process analysis. That is why times are recorded and processes documented their way rather than ours.

Time recording to the REFA method
Process documentation in a standard form
A methodology with a body of research behind it

What actually changes in the works

Not a percentage. Four things that are either true of a works floor or they are not.

The slip stops going missing

A routing slip exists once, in the system, and can be read at the next station without walking to find it.

Nobody retypes a shift

What is entered on the tablet is the record. The evening transfer from clipboard to spreadsheet disappears, and with it the typing errors.

An order can be reconstructed

Who did which step, when, with which material, and which inspection record belongs to it. That is what a customer complaint needs.

A change takes a day

A new process step, a new field, a new rule. Your own team leader does it, which is the difference between a system that follows the work and one the work has to follow.

Metalworking

Processing times at CNC machines, lathes and milling centres, assigned to the order without anyone typing a number.

Assembly and pre-assembly

Assembly times, quality checks and material used, recorded at the bench where the work happens.

Packing and logistics

Times for picking, packing and dispatch preparation, visible while the shift is still running.

It fits into what you already run

ERP, MES and an existing time-recording system can all stay where they are.

Open interfaces

A REST API for connecting to ERP systems such as SAP, Microsoft Dynamics or Sage, exchanging orders, material master data and time bookings.

Hardware you can buy anywhere

Ordinary Android tablets from Android 8.0 upwards, and RFID readers from several manufacturers. Nothing here ties you to one supplier.

Hosted by us or by you

You decide: our servers in Germany, or an installation on your own infrastructure. A works network that does not reach the internet is a case we have built for.

It keeps working offline

If the network drops, the tablets carry on. Data is held locally and synchronised once the connection is back.

Aktenplatz in action

Finding the paperwork for an order

One search field across documents, notes, emails and contacts. An order number is usually enough, including on paper that has been scanned.

Search results spanning documents, contacts and emails

Common questions about the shop floor