The economics

Your most expensive filing system is the one in someone’s head

What only one person knows costs you time every day, and once, when that person leaves, a great deal of money.

What you save

Time spent searching, follow-up questions, duplicated work, rework after mistakes, and the effort that goes into an audit.

What you gain

Somebody can cover without a handover, a new colleague reads the matter instead of being told about it, and the knowledge stays in the building.

Your investment

360 €

per user and year, for each active editor

The figure at the bottom is in your contract. The two at the top are written down nowhere, which is why they are rarely set against it.

On video

The same sum, talked through once

Watch on YouTube

Chapters

A click starts the video at that point.

The commentary is in German. We have not recorded an English version, and dubbing it would be worse than saying so. The chapter titles above are translated, so you can tell what is where. The video only loads once you start it, and nothing is fetched from YouTube before that.

Every piece of information passes three stations

Input, processing, output. Nothing is lost inside the stations. It is lost at the handovers between them.

01

Input

Where does the information come from?

Post, a mailbox, the portal, somebody calling across the corridor. Whatever arrives here unsorted has to be sorted by a person later, usually more than once.

What is lost: documents sit in personal mailboxes and are invisible to everybody else.

02

Processing

Who does what with it?

Check it, assign it, approve it, pass it on. Without a fixed responsibility you get the sentence "I thought you were doing that".

What is lost: follow-up questions, duplicated work, and matters that sit between two responsibilities.

03

Output

Who needs the result?

A colleague, a client, an auditor, a successor. If the result stays in one head or in one private folder, the search starts again from the beginning.

What is lost: knowledge stays attached to people instead of to the matter.

How good are your information flows?

Six marks decide whether a piece of information arrives or creates work. Award nought to five, and the shape shows where it is stuck.

OriginSupplierQualityRecipientQuantityPurpose

Origin

Can you tell where a piece of information came from?

Supplier

Is it clear who has to deliver it, and by when?

Quality

Does it arrive complete and usable?

Recipient

Does the recipient know it is meant for them?

Quantity

Is it the amount needed, neither too much nor too little?

Purpose

Can you tell what it is needed for?

Nothing is entered yet. Award the values honestly. The dent shows where the follow-up questions come from, the ones nobody books as a cost.

What a departure costs

Three items. The first two end up on an invoice eventually. The third never does.

01

The search

Advertising, interviews, an agency fee where it comes to that. Plus the time of the people doing the selecting.

02

The induction

Weeks until full output, and the time of the colleagues who stay alongside.

03

Knowledge that does not come back

The part never written down: the arrangements, the judgement calls, "with this client we do it this way".

Only the third item can be influenced in advance. How large it is in your organisation hangs on one question: how much of the knowledge sits on the matter, and how much on the person? Go through the last three handovers and count what the successor had to ask about. That number is yours, and it beats any rule of thumb we could offer you.

Document management prevents nobody from leaving. It only moves the line between what stays and what goes with them.

Six details, and the follow-up question disappears

An instruction is only complete once these six points are settled. Leave one out and it costs two people time: one asks, the other answers.

01

Who

By name, not "the team"

02

What

The task in one sentence

03

Which result

How you can tell it is finished

04

Which means

Documents, access, budget

05

By when

A date, not a priority

06

How long

The estimated effort

And the acknowledgement

An instruction does not count as given because it was sent, but because somebody accepted it. Without that step it stays open who is currently responsible.

The task dialog in Aktenplatz carries these same fields, acknowledgement included. The German version of this page shows it; we have not recorded that dialog with an English interface yet.

What Aktenplatz takes on here

The matter carries the knowledge

Correspondence, tasks, deadlines and decisions hang on the case, not in one person’s mailbox.

Cover without a handover

Whoever steps in sees the same state of play. Permissions get switched over, rather than knowledge transferred.

Tasks with a date instead of a shout

Responsibility, deadline and estimated effort sit on the matter. Done means acknowledged.

Traceable without asking anyone

Who changed what and when is in the log, which saves reconstructing it from memory.

Board view in Aktenplatz with cases sorted into status columns

The board view. Which matters are open, who has them, and what is waiting on somebody else, without anybody having to ask around.

Common questions about taking work off people